EchoSign: Merge Mapping Date Fields from SalesForce in the Correct Format

Hey All,

 

I’m using EchoSign with an Enterprise Edition of SalesForce.

 

I have an opportunity in SF with a Date field (not a Date/Time) field.  I setup merge mapping using EchoSign so that this date field would merge into an EchoSign PDF. 

 

The format of the date in SF is:

 

01/21/2013

 

The format of that same date in EchoSign is:

 

2013/01/21 00:00:00

 

I’d like to control the format of the date in EchoSign.  Can anyone help with this?  Thanks in advance

<

p class=”wpematico_credit”>Powered by WPeMatico